Siedlerstraße 7 | 68623 Lampertheim, Germany

info@zamann-pharma.com

Lot Release Without Full Review? LabWare 8 Stops the Risk

Introduction: The Hidden Danger in Lot Release

Lot release is the single most critical step in pharmaceutical quality management. It determines whether a batch of drug product is safe to reach patients. Yet across the industry, deviations continue to occur: lots are released even though not all underlying samples or tests have been fully reviewed and approved.

This is not just an operational error — it’s a compliance nightmare. Releasing an incomplete lot undermines data integrity, exposes companies to inspection findings, and risks patient safety.

The good news? With LabWare 8, companies can configure systematic controls that block lot release until all samples are reviewed and approved. This is not just an IT tweak; it’s a strategic improvement that removes reliance on human vigilance alone and builds quality into the system.

 

The Business Impact of Uncontrolled Lot Release

The financial and reputational risks of premature lot release are significant:

  • Inspection findings: FDA and EMA expect evidence that all testing is complete before release. Missing reviews trigger major observations.
  • Deviation investigations: Each incorrect release requires costly root cause analysis, CAPAs, and in some cases, product recalls.
  • Patient risk: An unreviewed sample may hide a critical out-of-specification result that undermines product quality.
  • Reputational damage: Even a single lot release error can erode trust with regulators and healthcare providers.

Real case: At a large biologics manufacturer, an FDA 483 observation noted that a lot was released before all microbiological samples had been reviewed. The company spent months implementing corrective actions, delaying supply and costing millions in lost sales.

 

Why Lot Release Errors Happen

  1.  Human FactorsEmployees under pressure may overlook pending sample reviews and proceed to release.
  2.  Disconnected SystemsWhen LIMS, QMS, and ERP systems are not integrated, lot status can appear “ready” even with missing approvals.
  3.  Overreliance on Procedural ControlsSOPs instruct staff to “check all samples,” but without system enforcement, compliance depends solely on human focus.
  4.  Inadequate System ConfigurationMany companies underutilize their LIMS capabilities, failing to configure blocking rules that enforce completeness.

 

Quick Self-Diagnostic: Is Your Lot Release at Risk?

Check yourself. If you say “yes” to three or more, you have a critical compliance gap.

  1.  Can your system technically allow lot release with pending sample reviews?
  2.  Have you had deviations citing “lot released without full review”?
  3.  Do you rely mainly on SOP reminders instead of system blocks?
  4.  Do employees complain about pressure to release quickly?
  5.  Are lot release errors part of repeat CAPAs in your QMS?
  6.  Has an inspector ever asked how your system prevents incomplete lot release?
  7.  Is “human error” your default root cause for lot release deviations?

 

What Regulators Expect: Compliance Clarity

Lot release is one of the most scrutinized processes during inspections.

  • EU GMP Annex 16: The Qualified Person (QP) must ensure that the entire manufacturing and testing process is complete and compliant before batch release.
  • FDA 21 CFR 211.165: Testing must be completed before release for distribution.
  • ICH Q10 Pharmaceutical Quality System: Requires robust systems that prevent incomplete product release.

Inspectors expect to see systematic, validated controls that prevent release until all reviews are complete — not just procedural reliance on operators.

  • Read EU GMP Annex 16
  • Read FDA CFR 21 Part 211.165

 

How LabWare 8 Fixes the Problem

  1.  Automated Lot BlockingLabWare 8 can be configured to block lot release until every associated sample is reviewed and approved.
  2.  Fail-Safe Against Human ErrorEven if an employee tries to push a lot forward prematurely, the system enforces the rule and prevents release.
  3.  Seamless Review VisibilityManagers and QPs see at a glance which samples are pending review, reducing bottlenecks and ensuring timely oversight.
  4.  Audit-Proof Data IntegrityDuring inspections, auditors can see evidence that the system prevents incomplete release — eliminating reliance on subjective human checks.

Case Example: At a German pharma company, Zamann Pharma Support configured LabWare 8 to enforce lot release blocks. Within three months, deviations linked to premature lot release dropped to zero. The next EMA inspection praised the “systematic improvement” as an effective CAPA.

 

Action Plan for Leaders

  • Audit your current lot release process: can lots technically move forward with pending reviews?
  • Review your deviation history for “lot released without full review.”
  • Configure LabWare 8 to block release until all samples are approved.
  • Validate this control under CSV/CSA guidelines to ensure regulatory acceptance.
  • Train Key Users and QPs on the new workflow, highlighting how it strengthens compliance.

 

Leadership & Strategy: Building Quality Into the System

Lot release should never depend solely on human vigilance. By embedding controls directly into LIMS, companies transform compliance from a reactive procedure into a proactive, automated safeguard.

This shift reflects the principle of “Quality by Design”: building systems that prevent errors before they occur. Executives who prioritize such digital safeguards protect not only compliance but also business continuity and patient trust.

Picture of Alireza Zarei

Alireza Zarei

Alireza Zarei is the founder and CEO of Zamann Pharma Support GmbH in Germany. He pairs 20 years in GMP—beginning in a lab in 2005—with front-line global project delivery for companies such as Boehringer Ingelheim, Roche, BioNTech, Takeda, Fresenius Medical Care, Biotest, ratiopharm and others. He focuses on innovative validation and qualification procedures, master data management strategies, end-to-end LIMS implementation and care, with pragmatic advice on general Quality Management topics and management level OpEx consulting. Together with his team he also created Pharmuni.com as the leading GMP learning platform in the industry.