Validation does not protect a system once that system changes. However, most systems change without anyone updating their validation package. During a project at a pharmaceutical company in South America, this gap stood out as one of the most dangerous findings.
The problem came down to poor documentation and weak change control in the company’s PW systems. In other words, the validation records stopped keeping pace with the system they were meant to describe. As a result, the case carries one clear lesson: your validation is invalid the moment traceability is lost. In response, our team identified these gaps and set out a four-step action plan to restore traceability.
Our team supports the planning, execution, and maintenance of qualification and validation activities, including IQ, OQ, and PQ, to keep GMP-regulated systems compliant and under control.
Yes. Replacing equipment without re-executing EQ/PQ was a core failure in this case, and EMA and FDA treat such lifecycle gaps as a critical deficiency. Because EMA Annex 11 requires validation to reflect the actual configuration, any replacement should pass through risk-based change control, an impact assessment and a validation package update.
Without an impact assessment, change control records a modification but never evaluates its effect on the validated state. Consequently, the validation package and risk assessment fall out of date, and traceability from URS to PQ to review breaks. FDA CSA therefore expects risk-based change control, assessed before implementation and linked to the validation package.
Deviations should revise the risk assessment and link to the documentation updates they require. In this case, unlinked deviations left the risk assessment outdated. Since ICH Q12 makes lifecycle management mandatory, update the risk assessment after events and use periodic review to confirm the validated state.